MegaExcel | Hi-Level

Excel provided Hi-Level Mezzanines with a precise solution using MegaDecorated for a high-profile factory extension.

Previous projects completed by Hi-Level Mezzanines had been acheived using two layers of plasterboard and traditional taping and jointing methods. This process had proved to be time-consuming, untidy and costly. 15mm MegaDecorated in the Dolomite A Linen PVC finish was a superior solution combining an easy to clean surface with the highest plasterboard performance values achievable.

Jason Alexander, Project Manager at Hi-Level Mezzanines, was thoroughly impressed with the product:

"We required a 1 hour Fire Rated product that did not require decorating on site, and was faster to install than traditional methods. Our previous method required two layers of plasterboard and a clean-up operation of our newly installed floors due to the untidy nature of taping and jointing materials. The MegaDecorated product provides a great solution to these issues, with Labour savings. Our client is very pleased with the finished building."